Authorization to Construct (ATC) Permit

After an NPDES permit has been issued by the Division of Water Resources, the permittee must obtain an ATC permit from the Division prior to commencement of the construction of modifications or expansion of wastewater treatment facilities.  

ATC permits are required for the following activities:

Construction of new or expanding treatment facilities

Any addition, deletion, or modification of equipment or processes at an existing facility which has the potential to affect the treatment process

Upgrade or replacement of equipment with that of a different design or capacity that already permitted

Installation of piping which has the potential to by-pass any equipment or treatment component

NOTE:  Session Law 2011-394, which became effective July 1, 2011, no longer requires an ATC permit for construction work at the following facilities with an NPDES permit: waste generated from manufacturing facilities, power generation operations, compost facilities, mine dewatering activities, groundwater remediation discharges, and drinking water treatment facilities.

ATC REVIEW PROCESS: Most applications for modifications that do not result in an increase in discharge capacity or are not required to meet stricter effluent limits will be approved based upon the engineer's certification and will not receive a full technical review by the Division.  In order to implement this process we have created a new application form and have consolidated design requirements into the Minimum Design Criteria for NPDES Wastewater Treatment Facilities.  Effective June 1, 2013, applicants must utilize the new application form and design criteria.  All others will be returned as incomplete.  Effective August 1, 2013, all ATC applications for NPDES wastewater facilities will be processed by the NPDES Complex Permitting Unit.  Please contact Ron Berry at (919) 807-6396 with any questions on the ATC application materials or review process.

Application Forms & Minimum Design Criteria

If you have any questions about whether your project requires an Authorization to Construct please contact Ron Berry at (919) 807-6396.

To schedule a scoping or submittal meeting, please contact Ron Berry at (919) 807-6396 at least a week prior to the proposed meeting time.

38364 FEEDBACK

Your input is valuable to us. Please send us your feedback.

What type of feedback would you like to send?*

Ask a Question Report a Problem Have a Concern Make a Comment

(If you would like us to respond please include your phone or e-mail.)

Your Question has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Problem has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Concern has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Comment has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

*If you are a DENR employee with an I.T. issue, please submit a DOTS ticket.