Collection System: Fees
Activity (Category A) See Notes 1,2 | New Permit Application Fee / Annual Fee | Major Modification Fee See Note 3 |
Major Individual NPDES Permits | $3,440 | $1030 |
Minor Individual NPDES Permits | $860 | $260 |
Single Family Residences | $60 | $20 |
Stormwater and Wastewater Discharge General Permits | $100 | Not Applicable |
Recycle Systems | $360 | $110 |
Animal Permits(Small Operations) | $60 | Not Applicable |
Animal Permits (Medium Operations) | $180 | Not Applicable |
Animal Permits (Large Operations) | $360 | Not Applicable |
Nondischarge Major Permits | $1,310 | $395 |
Nondischarge Minor Permits | $810 | $245 |
| | Activity (Category B) See Note 1 | Additional Annual Fee See Note 4 | Project Fee See Note 4 |
| | Special Order by Consent – Major | $500 | $400 |
| | Special Order by Consent – Minor | $250 | $400 |
| | Activity (Category C) See Note 1 | Project Fee See Note 5 |
| | Sewer Extensions | $480 |
| | State Stormwater | $505 |
| | Water Quality Certifications – Major | $570 |
| | Water Quality Certifications – Minor | $240 |
| | Petroleum Contaminated Soils | $480 |
| | Miscellaneous Activities | Project Fee |
| | Permit Renewal | No Fee |
| | Authorization to Construct | No Fee |
| | Minor Permit Modification | No Fee |
Notes:
- Refer to definitions page for specific descriptions of each activity category.
- For new permit requests under activities listed in Category A, a fee equivalent to the corresponding annual fee is required. This fee is non-refundable if the permit request is denied. If the permit is granted, this fee applies as the annual fee for the first year after permit issuance.
- This fee is non-refundable if the permit request is denied. A major modification shall be defined as one that increases the volume, increases the pollutant load, results in a significant relocation of the discharge point, or results in a change in the characteristics of the waste generated.
- These fees shall be in addition to the associated annual fee as listed under Category A.
- This fee is non-refundable if the permit request is denied.
Definition of Permitted Activities