PermitsThe Infrastructure Finance Section Design Management Unit issues sewer extension permits and Authorization to Construct (ATC) Permits. All projects that are being funded through Infrastructure Finance Section administered funding assistance programs must be permitted through the Infrastructure Finance Section and receive approval of plans and specifications for funding.
Web Content Display
Submittal and Scoping MeetingsSubmittal meetings and scoping meetings provide an opportunity for applicants to discuss their project with appropriate review staff to present relevant scope and background information, ask questions about applicable rules and design critera, discuss innovative ideas and approaches, ask questions about the permitting process and timelines, and receive preliminary review comments on their design and application materials. Scoping MeetingsScoping meetings can occur anytime during the design and planning stages and typically involve representatives from the owner and their consulting engineer. It is usually helpful to provide preliminary design information and site drawings for discussion purposes. These meetings can help ensure applicable rules and design criteria are appropriately included in the final design documents and to get preliminary comments to identify possible issues related to permitting and approval. Submittal MeetingsSubmittal meetings can either occur with the physical submittal of the application package documents or be scheduled at the time of submittal for a later date. These meetings are most helpful when both the consulting engineer and the owner are present to discuss any review comments and to provide necessary responses to questions. How to scheduleTo schedule a scoping or submittal meeting, please contact Seth Robertson, PE at (919) 707-9175 or at seth.robertson@ncdenr.gov at least a week prior to the proposed meeting time. |