UST System Design and Installation Seminar for
Engineers and Contractors Slideshows (2012)

 

Introduction
UST System Design I
UST System Design II
UST System Design III
PreInstall (UST-6A)
Installation Inspection - Contractors
PostInstall (UST-6B)
 

 

Underground Storage Tank and/or Piping Installations

Installation of USTs and/or piping require an application (UST-6) to be submitted and approved by the UST Section prior to the installation of the UST System. Below are links to documents with information on Installation requirements. 

During installation you are required to have two inspections conducted by the UST Section. The first inspection is of the tank prior to placement in the ground and the second is after installation of the piping but prior to back-filling. You are required to schedule these inspections a minimum of 2 work days (not including weekends or holidays) prior to the day you propose to commence the activity. Prior to finalizing the schedule of the installation activity, such as scheduling tank delivery and a crane, it is recommended that you contact the inspector so that a mutually convenient inspection date may be arranged on or around your proposed date. Additionally, if you need to obtain a “One-Time Fuel Delivery” for testing purposes after installation, please advise the inspector prior to the inspection date so this authorization can be coordinated during the inspection process (note that overfill and spill prevention equipment will need to be installed). You should provide one or more weeks notice to have a better chance that your proposed installation date is open on the inspectors calendar. Note that inspections cannot be scheduled for weekends or state holidays.

If you wish to use petroleum or another regulated substance as ballast during installation then you need to follow the procedures outlined in Guidelines for Approval of One-Time Fuel Delivery at Install for Ballasting to receive approval for a one-time placement of a regulated substance in the UST System.

If you did not use a regulated substance for ballast then you will need to get approval to use petroleum or another regulated substance for line and leak detector testing during the final stages of installation. To receive this approval you need to follow the procedures outlined in Guidelines for Approval of One-Time Fuel Delivery at Install for Testing.

After the UST system installation is completed refer to the document at the following link for information on the leak detection and periodic testing requirements of each part of the UST system.

Secondary Containment O & M Requirements for UST System & Components Installed or Replaced after 11/1/2007

If you have any questions about the installation application process you can contact at (919) 707-8163 or at (919) 707-8162.

 

Web Content Display javax.portlet.title.56
  Permits and Inspection - Installation Forms Revision Date PDF DOC
  Instructions for completing UST-6 Application to Install or Replace USTs
8/2013 Notice of Intent to Install USTs  
UST-6 Application to Install or Replace USTs (Pre/Post-Install)
Effective 8/26/2013 and replaces UST-6A/6B package
8/2013 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6B Application to Install or Replace USTs (6A/B Only)
The UST-6B form will be accepted for installations with previously approved UST-6A (Revised 3/12) applications.
3/2012 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6C Application to Install or Replace USTs (Schedule of Materials)
12/2010 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6D Application to Install or Replace USTs (UST Spill Bucket Testing) 5/2013 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6E Application to Install or Replace USTs (Tank Installation Testing)
3/2012 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6F Application to Install or Replace USTs (Containment Sump/UDC Testing) 9/2013 Notice of Intent to Install USTs Notice of Intent to Install USTs
UST-6G Application to Install or Replace USTs (Piping Integrity Testing) 5/2013 Notice of Intent to Install USTs Notice of Intent to Install USTs
Web Content Display javax.portlet.title.56

UST Section • 1637 Mail Service Center, Raleigh, North Carolina 27699-1637 • (919) 707-8171 • FAX (919) 715-1117
N.C. Division of Waste Management • 217 West Jones Street, Raleigh, North Carolina 27603 • (919) 707-8200 • FAX (919) 707-8200
Site MapContact UsRegional OfficesNCGOVDENRDENR Customer Service• Need Help with this Website

38361 FEEDBACK

Your input is valuable to us. Please send us your feedback.

What type of feedback would you like to send?*

Ask a Question Report a Problem Have a Concern Make a Comment

(If you would like us to respond please include your phone or e-mail.)

Your Question has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Problem has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Concern has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Comment has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

*If you are a DENR employee with an I.T. issue, please submit a DOTS ticket.