skip to main content | skip to footer
N.C. Department of Environment and Natural Resources

NC Department of Environment and Natural Resources
Mining and Energy Commission - Draft Rules

Mining and Energy Commission

Status of Draft Rules

The Rule-Set Master List below shows the status of rules that the Mining and Energy Commission is working towards adopting:  Rule-Set Master List (Updated 19March2014)

The language of draft rules are posted to this page once they have been voted on and approved by a committee of the Mining and Energy Commission.  Once approved by the Environmental Standards Committee, the Water and Waste Management Committee, the Administration of Oil and Gas Committee or the Mining Committee, a rule must be reviewed and approved by both the Rules Committee and the full Mining and Energy Commission before it can be considered approved by the Mining and Energy Commission.  Once the Commission has approved all rules required by S.L. 2012-143, the complete package will be published in the North Carolina Register and undergo a formal public comment process before they are adopted. 

Environmental Standards Committee

Chemical Disclosure Requirements

Prohibited Chemicals and Constituents

Baseline and Subsequent Testing

Setback Rules

 

Water and Waste Management Committee

 Water Acquisition and Management Rules 

Waste Management Rules

 

Administration of Oil and Gas Committee

Well Construction Rules

Wellhead Standards

Well Closure

Well Spacing

Site Infrastructure & Construction Standards

Operation & Production

Well Stimulation

Financial Assurance- Bonding

Reclamation

Drilling Units

Permitting

 

Rules Committee

The following draft rule sections have been reviewed by the Rules Committee of the Mining and Energy Commission. These drafts show the technical changes that have been incorporated into the rules sections before transmittal to the full Mining and Energy Commission. 

Prohibited Chemical Constituents 

Chemical Disclosure Requirements 

Water Acquisition and Management Rules

Well Construction

 Baseline Subsequent Testing Rules

Wellhead Standards

Well Closure Rule

Setback Rules

Well Spacing

Site Infrastructure & Construction Standards

Operation & Production

Waste Management Rules

Well Stimulation Rules

Financial Assurance- Bonding

Reclamation

Permitting

Drilling Unit 

 

Full Mining and Energy Commission

The following draft rule sections have been reviewed by the Mining and Energy Commission. These drafts show the final draft versions that the full Mining and Energy Commission have voted on and approved.  Any changes made to the document at the MEC meeting during which the rule was discussed and voted on have been incorporated into these docouments below.

Prohibited Chemical Constituents

Water Aquisition and Management

 Well Construction Rule

Wellhead Standards

Baseline and Subsequent Testing

Well Closure Rules

Well Spacing

Chemical Disclosure

Setbacks

Site Infrastructure & Construction Standards

Operation & Production

Administrative Rules

Financial Assurance

Drilling Unit

Permitting

Reclamation

Pit & Tank Construction Standards

Waste Management

Well Stimulation

 

8198095 FEEDBACK

Your input is valuable to us. Please send us your feedback.

What type of feedback would you like to send?*

Ask a Question Report a Problem Have a Concern Make a Comment

(If you would like us to respond please include your phone or e-mail.)

Your Question has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Problem has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Concern has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

Your Comment has been sent. Thank you!

An internal server error prevented Your Question from being sent.
Please try again later, or call Toll-Free (877) 623-6748 for immediate assistance.

Please complete all highlighted items

*If you are a DENR employee with an I.T. issue, please submit a DOTS ticket.